Not signed in (Sign In)

Vanilla 1.0 is a product of Lussumo. More Information: Documentation, Community Support.

    • CommentAuthorqzz10011
    • CommentTimeNov 17th 2017
     

    back to install. Direct renovation at home takes 8-10 days, remove the floor to get the factory renovation, a total of about 10-15 days. The first approach is more common, but in the construction process, dust, noise pollution is more serious. The second method of renovation better, but also more troublesome, higher wages. 4, Floor renovation requirements of the material of the floor Solid wood, wood


    composite, bamboo flooring can be renovated three kinds of floor damage, you can take renovation measures. But also note that the surface layer thickness of these floors need to reach 4 mm Caixing, because when the floor renovation, you need to go through several grinding, if the floor is too thin, it will polish the middle layer, affecting the floor life. Strengthen the floor should not be refurbished


    Strengthen the floor if there is a more serious damage, do not recommend renovation, it is best to replace all. First, because the floor price is relatively low, the new floor and renovation price is not much difference; the other hand is due to strengthen the surface of the floor for its hardest part, the middle is generally made of high temperature glued, polished after renovation, It is easy to destroy the surface


    plastic wooden decking price composite per sqm

    cedar tone square lattice for sale

    how to make a wood deck railing for stairs

Add your comments
    Username Password
  • Format comments as