Not signed in (Sign In)

Vanilla 1.0 is a product of Lussumo. More Information: Documentation, Community Support.

    • CommentAuthorqzz10011
    • CommentTimeDec 16th 2017
     

    When paving, the floor is now covered with a layer of about 2mm thickness of the mats, made of high-density polyethylene, the interface needs to be sealed with tape, and then covered with a layer of the thickness of 0.5mm above Of the film, and then reconnected at the seams to 50mm above, and finally sealed with tape.


    Pavement should be paved from the room near the wall, the distance between the floor and the wall to reserve a gap of about 9mm best, for each row of the excess floor after paving the floor with a saw to saw. When paving the last row, measure the width of the last row very accurately, remove the excess floor accurately, and then use the hooks for paving. Finally, install the baseboard at the reserved area.


    After the cleaning is completed, the final step of course is to clean up the debris after a series of workings on the floor pavement, and then clean the entire floor.



    outbuildings composite decking on sale
    interlocking floor in philippines
    eco-friendly wpc decking for garden and balcony
Add your comments
    Username Password
  • Format comments as