Not signed in (Sign In)

Vanilla 1.0 is a product of Lussumo. More Information: Documentation, Community Support.

  1.  

    Before construction, the best approach to the floor in advance, placed in a well-ventilated place to open the box ventilation, one can release the wood floor paint taste. The second is to minimize the wet weather brought to the wood floor moisture, reduce the deformation may be brought in use, drums and sewing width and other issues.


    After the best paved floor after use for a period of time waxing, also known as sealed wax. This can try to evaporate the residual moisture in the construction, to extend the service life of the wooden floor.


    Finally, before the laying of the hair board (Daxin Ban or ten centimeter board) with wooden keel leveling the ground, the board is divided into 1200 �� 600 specifications, each board spacing reserved 1cm slit, so that the original ground moisture easily Spread out, to prevent the wooden floor drum phenomenon occurred. Clean up the residual soil residue on the ground, sprinkle some insecticide may be appropriate to prevent the reproduction of worms (mites, etc.).


    "waterproof exterior deck covering,board walks nature trails uk recycled materials,laminate flooring over decking"
Add your comments
    Username Password
  • Format comments as