Not signed in (Sign In)

Vanilla 1.0 is a product of Lussumo. More Information: Documentation, Community Support.

    • CommentAuthorqzz10011
    • CommentTimeMar 3rd 2018

    First, keep the material properly

    Floor products in the pavement before, should be flat at room temperature for two days, then paving work. In order to better prevent the floor from damp, these flooring materials should be kept in a well-ventilated place, protected against drying, and protected with a plastic film. If there is damp wood flooring products, then these should not continue to use. Can not save money, but the damp floor dried, and then continue to use. This can lead to moldy floors or reduce their life span.

    Second, the material should be prepared for moisture-proof treatment

    After purchasing a good wooden flooring products, but also before laying a moisture-proof treatment. Can be coated with moisture-proof protective paint on the back of the floor, which is to prevent paving the ground moist, then affect the floor as a whole, resulting in floor hollowing problem.

    Third, before laying the wooden floor, the ground should be cleaned

    Whether it is solid wood flooring or parquet, should be paved before the ground floor to conduct a clean-up. First of all, the first on the ground of cement, sand and other clean up, and secondly, but also to clean the ground, keep clean, and finally, before paving, brushing a layer of diluted slurry to remove stains on the floor, and then Paving.Learn these small coup, before laying the floor can effectively avoid damp wood flooring, the future of the use of adversely affected. Spend a little careful every day, learn a small knowledge of wood flooring, why not do it.

    "wholesale pvc fence,how to build interlocking deck tile,закрепление навеса беседки на палубе"
Add your comments
    Username Password
  • Format comments as