Not signed in (Sign In)

Vanilla 1.0 is a product of Lussumo. More Information: Documentation, Community Support.

    • CommentAuthorbirder2525
    • CommentTimeMar 14th 2018
     
    Only the ore milling equipment 'trial delivery of the tile', in order to allow the entire thermal power unit safe operation In addition, pulverizer compared to other ore milling equipment, more cost-effective. Under normal circumstances, because the machine day and night during the operation of the loss is very large, so the replacement parts, downtime inspection is the end of the operation of the machine through the glass and the mill mill grinding machine parts than other grinding equipment longer, And the reliability of the operation is higher, if the case of downtime replacement, downtime inspection time is short and easy parts replacement.

    In addition, mill in the work process, the fine grinding of coal powder is also related to the quality of power plant combustion. After the bowl-type mill has completed the grinding and grinding work, the pulverized coal is blown into the boiler by heat, and then the hot flue gas formed by the coal combustion after the boiler is fully combusted will be exothermic along the boiler flow. Coal ash separation. pulverizer grinding efficiency and fine degree of a good guarantee, then easier, the coal in the boiler full combustion, but also improve the utilization of coal and reduce the possibility of environmental pollution.
Add your comments
    Username Password
  • Format comments as